Flood Risk Framework
High Speed Rail (Crewe – Manchester) Environmental Statement, Glossary, abbreviations and references, published by the Department for Transport in 2022, defines the Flood Risk Framework as:
A system devised by The Scottish Environment Protection Agency that aids decision-making in spatial planning. Areas are filtered into three categories based on their level of potential risk of flooding. The categories are: • Little or No Risk Area: Annual probability of watercourse, tidal or coastal flooding is less than 0.1% (1 in 1000 years); • Low to Medium Risk Area: Annual probability of watercourse, tidal or coastal flooding in the range 0.1% - 0.5% (1 in 1000 years to 1 in 200 years); and • Medium to High Risk Area: Annual probability of watercourse, tidal or coastal flooding greater than 0.5% (1 in 200 years).’ |
[edit] Related articles on Designing Buildings
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.